Price comparison information publicity of equipment noise control phase II project of Chengdu carbon branch

  • Categories:Bidding column
  • Author:
  • Origin:
  • Time of issue:2021-12-29 11:51
  • Views:

Project Name: Chengdu carbon branch equipment noise control phase II project.

I. Project Overview

(1) Project name: The second phase project of equipment noise control in Chengdu Carbon Branch Plant.

(2) Project location: No. 88, South 2nd Road, Economic Development Zone, Chengdu City, Sichuan Province.

Second, the noise control point of the branch equipment

Serial number

Equipment location

Noise Control Standards

1

A total of 3 soundproof rooms for the dust collector fan, air compressor room, and 3 vacuum pump units in the first phase of the first workshop

The equipment at the 1st and 2nd points shall be treated with noise, and the noise at the site shall be less than 65 decibels after treatment

2

3 sets of vacuum pumps for engraving machines in the second workshop of the machine plus machine, 3 # dust removal fans in the machine plus two workshops, a total of 2 soundproof rooms, and two sets of chimney mufflers

3

The air ducts of the discharge outlets of the 4 single dust collectors in the first workshop of the machine are raised to the top of the workshop

Three, quotation

The units participating in this quotation should have relevant business scope qualifications, the noise control plan and standards should meet the industry standards for noise control, and the quotation should include a special 9% or 1% value-added tax invoice for engineering.

The quotation should be stamped with the company's fresh seal and business license (the copy of the business license needs to be stamped with the fresh seal) and sent to xiaoxiong@fangdacarbon.com before 12:00 on January 5, 2022, contact number: Xiao Xiong 18782282970.

Four, review

(1) Review time and place

The review is presided over by Party A, and the quotation unit does not participate in the review process.

Judging time: 14:00 on January 5, 2022.

Assessment venue: Office of the Equipment Department.

(2) If the quotation falls under any of the following circumstances, it will be considered invalid after being reviewed by the review team:

1. The quotation is not stamped as required; the content is incomplete or the key words are blurred and unrecognizable.

2. Submit two or more quotations with different contents or submit two or more quotations in one comparison application document, and do not declare which one is valid.

3. Beyond the business scope of the business license.

4. During the evaluation process, if the evaluation team finds that they participated in the competition in the name of others, or participated in the competition by means of collusion, bribery, or fraud.

(3) The evaluation members selected relevant members from the company's expert database to chat with the project participating units on-site by phone or video to determine the winning bidder.

Chengdu Carbon Co., Ltd. Equipment Department

December 29, 2021